
Chillicothe — The public could comment on potential new controls on construction of data centers and similar facilities within city limits, in the city’s Monday evening open house.
On November 16th, 2026, the City of Chillicothe offered a public open house “to gather public input considering amendments to the UDC to establish land use standards for data centers, battery energy storage systems, cryptocurrency mining operations, and other similar projects. Public input received will help guide the development of future amendments.”
About 70 attended the two-hour informal event in “Armory Ballroom” in the newly renovated Memorial Armory. Similar to previous open houses on local government projects, after an overall introduction, attendees could write on or put dots on display panels to show their preferences for regulatory action, and chat with members of government.
Zoning codes are land use regulations that define what is allowed to be built and where. The UDC or “Unified Development Code” replaced zoning and other decades-old regulations in the city code in 2025. It also incorporates updated subdivision regulations and sign code. (Find a webpage on it in the city’s website.)
With concerns over the “data hall” or data center proposed for part of the paper mill site this year, city council reacted with a 60-day moratorium on data centers – but then rescinded it after realizing that the developer had previously inquired about existing regulations, and thus apparently legally insulated themselves from any new controls.
The consultants from American Structurepoint who wrote the UDC are assisting in potential updates, and helped with the open house. After mayor Luke Feeney’s introduction, project manager David Baird gave instructions before the assembly moved to the four display areas. Hear both in the below video.
The update would define four types of facilities, and controls on them: small data centers, large data centers, battery energy storage systems, and cryptomining facilities. Display boards asked whether any should be allowed with regulations, what are concerns about them, and what regulations should apply. (See the displays at the end of the below introductory video.)
The preliminaries were video-recorded by the Greater Chillicothe Film Commission, and shared on the city’s Facebook page.

I asked the mayor what the status was of the data center / data hall proposed by the company Alignment Engine for the “Chilpaco Innovation Campus.”
Feeney confirmed that their proposal is ‘grandfathered’ from any city controls of data centers, since there were none when Alignment Engine asked about them – and that an application has been made for a data center and it is being processed.
He said they need building and possibly zoning permits, which is handled by the city’s Building and Zoning Department, and he said he did not know details about any.
Feeney said the event had a great turnout with a wide range of opinions. “What we want to do is hear from the community, make sure your voice is heard, and make sure the laws and the codes that impact this community and create the vibrant space are built by the people who live and work here.”
To add comments, he said the public can send them to or call the mayor’s office. Ultimately, council decides on code changes, so he recommended to also contact them.
Staff from U.S. Paper Mill LLC attended, including the owner, John Todoroki. Although not directly involved in the data hall / data center – he said he is just the landlord – he and his managers have been attending such meetings.
That included Aaron Anders, Utilities Superintendent for U.S. Paper Mill. I asked him for details about the recent problem with well pumps near the Wear-Ever groundwater pollution. Learn more in the side story.
With the state and national coverage of data centers – and much development of them in central Ohio – WSYX channel 6 Columbus also reported on the gathering.










